CBCA 2693
Board: CBCA
Appellant: 1-A Construcion & Fire, LLP
Date: 2015-03-17
Outcome: dismissed
DENIED IN PART; DISMISSED
FOR LACK OF JURISDICTION IN PART:
March 17, 2015
CBCA 2693
1-A CONSTRUCTION & FIRE, LLP,
Appellant,
v.
DEPARTMENT OF AGRICULTURE,
Respondent.
Patricia A. Maier, Senior Partner of 1-A Construction & Fire, LLP, Hermiston, OR,
appearing for Appellant.
Mary E. Sajna, Office of the General Counsel, Department of Agriculture, Portland,
OR, counsel for Respondent.
Before Board Judges GOODMAN, DRUMMOND, and LESTER.
LESTER, Board Judge.
Appellant, 1-A Construction & Fire, LLP (1-A Construction), appeals the final
decision by a contracting officer for the United States Forest Service (USFS) terminating for
default 1-A Constructionâs contract for water system upgrades at five locations in the
Umatilla National Forest. In its notice of appeal, 1-A Construction also asks the Board to
award it monetary damages for various cost increases for which it blames the USFS, and, in
turn, the USFS asks the Board to award it excess reprocurement costs associated with
CBCA 2693 2
completing the work that was required under 1-A Constructionâs contract. For the reasons
explained below, in response to the partiesâ request for a decision on the record under CBCA
Rule 19, 48 CFR 6101.19 (2014),1 we sustain the USFSâs termination for default, but we
dismiss for lack of jurisdiction both 1-A Constructionâs request for monetary damages and
the USFSâs request for excess reprocurement costs.
Findings of Fact
I. The Terms of 1-A Constructionâs Contract
On May 28, 2010, the USFS awarded a fixed-price construction contract, contract no.
AG-0489-C-10-0304 (the contract), to 1-A Construction for âupgrades to small water
systems at five locations throughout the Umatilla National Forest,â at a total price of
$262,939.03. Appeal File (AF) at 35, 41, 114. The five project sites, each of which was
remotely located in the Blue Mountains of eastern Oregon, were (1) the Fremont Work
Center, within the North Fork John Day Ranger District of the Umatilla National Forest;
(2) the Umatilla Forks Campground, in the Walla Walla Ranger District; (3) the Woodward
Campground, also in the Walla Walla Ranger District; (4) the Ditch Creek Cabin
Campground, in the Heppner Ranger District; and (5) the Bull Prairie Campground, also in
the Heppner Ranger District. Id. at 41-42, 114-15, 303-04.
In describing the contract work, the USFS represented that the existing water systems
at the project sites âwere built as long as 40 years ago and now have pressure, and sanitary
deficiencies.â AF at 41, 114. The contract provided that the contract awardee would have
to modify or entirely replace the â[s]upply, storage, and distribution systems . . . as needed
to address these issues.â Id. The work was to include, but was not limited to, (1) installation
of three utility buildings, which would house a triple pressure tank system, a single pressure
tank system, and a gravity fed system; (2) replacement of two 10,000-gallon steel water
storage tanks with new fiberglass plastic reinforced tanks; (3) replacement and/or installation
of approximately 6360 feet of water line; (4) installation of power, control, and telephone
lines; and (5) installation of fourteen hydrant assemblies. Id. The contractor was required
to âfurnish the necessary personnel, material, equipment, services and facilities (except as
otherwise provided), to perform the Statement of Work/Specificationsâ set forth in the
contract. Id. at 42 (incorporating language from 48 CFR 452.211-72).
1
Although the parties originally filed cross-motions for summary relief under CBCA
Rule 8(g), they subsequently converted those motions to a request for a decision on the
record under Rule 19.
CBCA 2693 3
The project specifications for the contract indicated that the contractor would âhave
full use of premises for construction operations, including use of Project site, during [the]
construction period.â AF at 115 (section 5.4.A). Nevertheless, the specifications expressly
warned the awardee that, because of the elevation of the project sites, heavy snowfall and
cold temperatures could affect them:
The elevation of the sites range from approximately 2700-5200 feet above
mean sea level. The construction sites may experience heavy snowfall and
cold temperatures, with snow on the ground typically from mid-September
through June.
Id.