Matter of:Roy McGinnis & Co., Inc.

Case: B-275988 Agency: Central Intelligence Agency Protester: Matter of:Roy McGinnis & Co., Inc. Date: 1997-04-28 Denied
View full decision with AI analysis on ProtestIntel →
B-275988 Apr 28, 1997 Jump To VIEW DECISION RELATED PAGES GAO CONTACTS Highlights DIGEST Protest that late bid should be considered because its late receipt was due to government mishandling is denied where paramount cause of late receipt was not government mishandling. Which was transmitted by facsimile. That its rejection was therefore improper. The IFB was issued on October 24. The designated fax machine was located in a room adjacent to the bid opening room. Bid opening had begun and the bid was rejected as late. The transmission record for the unofficial fax machine (which was located approximately 120 feet away from the bid opening room) shows that McGinnis began transmitting the second copy of its modification at 1:59 p.m. It was delivered to the bid opening room at 2:20 p.m. [1] McGinnis protests that the modification that was faxed to the designated machine did. View Decision Matter of: Roy McGinnis & Co., Inc. File: B-275988 Date: April 28, 1997 DIGEST Attorneys DECISION Roy McGinnis & Co., Inc. protests the Department of the Army's rejection of its bid modification as late under invitation for bids (IFB) No. DACA63-97-B-0003. McGinnis alleges that its bid modification, which was transmitted by facsimile, reached the agency prior to the time established in the solicitation for bid opening, and that its rejection was therefore improper. We deny the protest. The IFB was issued on October 24, 1996, for construction and renovation services to alter classrooms, kitchen laboratories, and other portions of two designated buildings. The IFB included Federal Acquisition Regulation (FAR) clause 52.214-31, permitting bids and bid modifications to be submitted by facsimile; the solicitation specified 817/978-3166 as the fax equipment dedicated to receiving such documents. The IFB provided the bid opening location, listing a street address and room number, and established that bids would be opened at 2 p.m. on December 17, 1996. McGinnis submitted a bid without prices on December 3, and attempted to add this information to its bid by faxing a completed bid schedule as a bid modification on December 17. The record shows that McGinnis transmitted one copy of its modification to the designated fax number and another copy to a fax machine provided by the agency as an alternate number under previous solicitations. The machine-generated fax receipt log for the designated machine shows that McGinnis began transmitting its 5-page modification at 1:58 p.m. on December 17, and that the transmission took 1 minute and 55 seconds. The designated fax machine was located in a room adjacent to the bid opening room. When the fax arrived, 5 seconds before the scheduled bid opening, the clerk stationed at the machine followed the agency's established procedure of recording the bidder's name, the solicitation number, time and date removed from the fax machine, and the clerk's initials on an envelope, enclosing and sealing the fax in the envelope, and then delivering the envelope to the bid opening room by hand. The clerk noted the time of receipt on the envelope as 2:03 p.m. When she delivered the bid to the bid opening officer, bid opening had begun and the bid was rejected as late. The transmission record for the unofficial fax machine (which was located approximately 120 feet away from the bid opening room) shows that McGinnis began transmitting the second copy of its modification at 1:59 p.m. Since this transmission also took 1 minute, 55 seconds, it arrived after the 2 p.m. bid opening time; it was delivered to the bid opening room at 2:20 p.m. [1] McGinnis protests that the modification that was faxed to the designated machine did, in fact, arrive before the 2 p.m. deadline and that it therefore should not have been rejected as late. McGinnis argues that the clerk must have made a mistake in noting the arrival time as 2:03 p.m., since the machine's transmission record shows the fax's arrival time as 1:58:55. The protester argues that once its modification was received by the designated fax machine prior to 2 p.m., as evidenced by the fax machine log, "any subsequent failure of delivery is due solely to government mishandling." A bid received in the office designated for the receipt of bids after the time set for bid opening is a late bid. FAR Sec. 14.304-1. It is the responsibility of the bidder to deliver its bid to the proper place at the proper time, and late delivery generally requires that a bid be rejected. PDP Analytical Servs., B-251776.2 et al., Apr. 5, 1993, 93-1 CPD Para. 294 at 3. However, a late bid can be considered for award if government mishandling after timely receipt at the agency was the paramount cause for its late receipt in the bid opening room, and consideration of the late bid would not compromise the integrity of the procurement process. Butt Const. Co., Inc., B-258507, Jan. 30, 1995, 95-1 CPD 45 at 3; John J. Kirlin, Inc., B-250244, Dec. 15, 1992, 92-2 CPD Para. 419 at 2.

Full decision text continues on ProtestIntel...