Brickwood Contractors, Inc.

Case: B-290444 Agency: Protester: Brickwood Contractors, Inc. Date: 2002-07-03 Denied
View full decision with AI analysis on ProtestIntel →
B-290444 Jul 03, 2002 Jump To VIEW DECISION DOWNLOADS RELATED PAGES GAO CONTACTS Highlights A firm protested a Coast Guard contract award for repairs to the Ambrose Light Tower, contending that (1) the Coast Guard did not refer to the Small Business Administration (SBA) in a timely manner its determination that the protester was nonresponsible, and (2) it extended its bid acceptance period as requested by the Coast Guard. GAO held that: (1) the Coast Guard diligently reviewed the protester's responsibility, found the protester nonresponsible, and then promptly referred the matter to SBA under certificate of competency procedures, and because of the length of time required to complete these reviews, the bidders were requested to extend their bids; and (2) the Coast Guard denies receipt and there is not other evidence of receipt of the protester's bid extension by facsimile and there is not other evidence of receipt. Accordingly, the protest was denied. View Decision B-192580, DECEMBER 5, 1978 DIGEST: 1. NOTE, ACCOMPANYING BID FOR PAINTING WORK, WHICH STATES "BID PRICE REDUCED $3,000 IF NOTICE TO PROCEED IS ISSUED WITHIN 7 DAYS OR SOONER IN ORDER FOR WORK TO BE COMPLETED THIS FALL" COULD NOT BE GIVEN EFFECT IN EVALUATION OF BIDS SINCE BY EFFECTIVELY LIMITING TIME FOR ACCEPTANCE OF BID, NOTE CONFLICTED WITH MATERIAL PROVISION OF IFB. 2. CONTRACTING OFFICER LACKS AUTHORITY TO DIRECT OR PERMIT BIDDER TO DELETE FROM BID, AFTER BID OPENING, LANGUAGE WHICH MATERIALLY QUALIFIES BID. ALLEN WILSON D/B/A B.P.O.A. CONTRACTORS: ALLEN WILSON, DOING BUSINESS AS B.P.O.A. CONTRACTORS (WILSON), PROTESTS AWARD OF A CONTRACT TO A CONTRACTOR OTHER THAN HIMSELF, UNDER INVITATION FOR BIDS (IFB) NO. DAKF70-78-B-0043 ISSUED BY THE DEPARTMENT OF THE ARMY, FORT RICHARDSON, ALASKA, FOR THE EXTERIOR PAINTING OF FOURTEEN BUILDINGS AT FORT WAINWRIGHT, ALASKA, CONSISTING OF A BASE BID FOR 8 BUILDINGS AND SIX ADDITIVE ITEMS OF ONE BUILDING EACH. THE PROCUREMENT WAS TOTALLY SET ASIDE FOR SMALL BUSINESS CONCERNS. SHORTLY BEFORE THE SCHEDULED BID OPENING, ON JULY 25, 1978, WILSON ASKED THE BID OPENING OFFICER IF HE COULD REPOSSESS HIS BID. HE WAS ALLOWED TO DO SO. HE THEN OPENED THE SEALED ENVELOPE, INSERTED A HAND WRITTEN NOTE, RESEALED THE ENVELOPE WITH TAPE, SIGNED THE ENVELOPE AND REDEPOSITED IT. AT THE ANNOUNCED TIME, THE BID OPENING OFFICER OPENED THE BIDS AND THEY WERE READ. WHEN SHE CAME TO THE WILSON BID IT WAS $82,810 FOR THE BASE BID AND $5,249 FOR THE ADDITIVE ITEMS FOR A TOTAL OF $88,059. HOWEVER, THE NOTE MENTIONED ABOVE READ: "BID PRICE REDUCED $3,000 IF NOTICE TO PROCEED IS ISSUED WITHIN 7 DAYS OR SOONER IN ORDER FOR WORK TO BE COMPLETED THIS FALL." AFTER READING THE BID AND THE NOTE, THE BID OPENING OFFICER AND WILSON HAD A DISCUSSION CONCERNING THE NOTE. THERE IS A CONFLICT AS TO WHETHER THE BID OPENING OFFICER TOLD WILSON TO CROSS OFF CERTAIN WORDS OF THE NOTE, OR SUGGESTED THAT TO HIM, OR MERELY PERMITTED HIM TO TAKE THE ACTION HE TOOK. IN ANY EVENT, AFTER THE BID WITH THE ENCLOSED NOTE WAS READ ALOUD, WILSON DID LINE OUT THE WORDS "IF NOTICE TO PROCEED IS ISSUED WITHIN 7 DAYS". IT WAS LATER DETERMINED THAT AN ARITHMETIC ERROR WAS MADE IN THE ADDITIVE BID WITH THE RESULT THAT THE ORIGINAL WILSON BID WAS $88,000. THE NOTE REDUCED THAT BID BY $3,000 TO $85,000. THERE WERE TWO OTHER BIDS THAT WERE BETWEEN $88,000 AND $85,000. THUS, IF THE NOTE REDUCING THE BID WERE CONSIDERED, WILSON WOULD BECOME THE LOW BIDDER. DURING THE BID EVALUATION THE CONTRACTING OFFICER DETERMINED THAT THE BID OPENING OFFICER SHOULD NOT HAVE ALLOWED WILSON TO DELETE A PORTION OF THE NOTE REDUCING THE BID PRICE AND THAT THE BID, BEFORE THE DELETION, PUT A RESTRICTION ON THE GOVERNMENT, I.E. REQUIRED THE AWARD TO BE MADE WITHIN 7 DAYS. ACCORDINGLY, WILSON WAS NOTIFIED ON AUGUST 4 (MORE THAN 7 DAYS AFTER BID OPENING) THAT HE WAS NOT THE LOW BIDDER BECAUSE THE CROSSED OUT CONDITION MUST BE READ INTO THE BID AND THE NOTICE TO PROCEED HAD NOT BEEN FURNISHED WITHIN 7 DAYS. WILSON CONTENDS THAT THE CONDITION IMPOSED BY THE NOTE WAS NOT OF A SUBSTANTIVE NATURE AND THAT HE WAS THEREFORE PROPERLY AUTHORIZED BY THE BID OPENING OFFICER TO DELETE THE OBJECTIONABLE PORTION AFTER BID OPENING AS PERMITTED BY DEFENSE ACQUISITION REGULATION (DAR) SEC. 2 404.2(D) (1976 ED.). SIMILARLY, WILSON MAINTAINS THAT THE CONDITION WAS A MINOR INFORMALITY OR IRREGULARITY WAIVABLE UNDER DAR SEC. 2-405. IN EITHER EVENT, WILSON STATES, THE EFFECT WAS TO UNCONDITIONALLY REDUCE HIS BID BY $3,000. ACCORDINGLY, WILSON ARGUES, HE SHOULD BE CONSIDERED THE LOWEST BIDDER AND AWARD SHOULD BE MADE TO HIM. WILSON'S NOTE CONSTITUTED AN ALTERNATE BID OF $85,000 CONDITIONED UPON THE GOVERNMENT'S ISSUANCE OF A NOTICE TO PROCEED WITHIN SEVEN DAYS OF THE BID OPENING. HOWEVER, A NOTICE TO PROCEED CANNOT BE ISSUED UNTIL A BID IS ACCEPTED AND PAYMENT AND PERFORMANCE BONDS ARE OBTAINED.

Full decision text continues on ProtestIntel...